99% Chimpanzee - 1% Human

Wed, 08 Feb 2006

Fixing a Hole

Our contractor framed in two huge holes in the long hallway, in order to provide access to the under-eaves area for storage and to get at the AC unit. Unfortunately, they were made inordinately large. We've been at a loss as to what to do with them for a long while now. We considered doors, swinging bookshelves, panels, and the like, and finally settled on installing a wall mounted cabinet into the hole. Wall mounted since they typically don't have the extra just-above-the-floor construction.

Having made our plans, now we just needed to downsize the gaping hole to accommodate the new cabinets. They're both in slightly different states of being done.

DSCN4508 DSCN4509

[10:26] | [home] | [#] | [G] | [Comments: 1]
Hey Guys check the weather and keep a high profile, i.e. expect flooding in Hond mainland Saturday or later, Hurrican Adrian on its' way from the Pacific, could mean major flooding at Hond  airport.  Saw your pictures, no you are having a great time.  Love from us,  Dad and Jan
Posted by Jan at Thu May 19 11:11:01 2005


Name:


E-mail:


URL:


Comment:


Enter an odd integer below:


< February 2006 >
SuMoTuWeThFrSa
    1 2 3 4
5 6 7 8 91011
12131415161718
19202122232425
262728    
Latest Software
Flickr
www.flickr.com
This is a Flickr badge showing public photos from urbanape. Make your own badge here.
Categories
all: (159)
  home: (36)
  play: (87)
  software: (32)
  work: (4)
Archives
On Tap
On the Nightstand
Douglas Hofstadter's Gödel, Escher, Bach: an Eternal Golden Braid
Syndication